Lee Kothera

Contributing Writer



Tube and Pipe Production | Articles

Presenting coil to a tube mill

September 4, 2001 | By Lee Kothera

Tubemakers looking to improve operations at the front of the mill should consider factors such as coil preparation before feeding it into the tube mill—end joining, removal of overthickness, burr up/down condition, and accumulation.

Continue Reading