Senior Editor
- FMA
- The Fabricator
- FABTECH
- Canadian Metalworking
Categories
- Additive Manufacturing
- Aluminum Welding
- Arc Welding
- Assembly and Joining
- Automation and Robotics
- Bending and Forming
- Consumables
- Cutting and Weld Prep
- Electric Vehicles
- En Español
- Finishing
- Hydroforming
- Laser Cutting
- Laser Welding
- Machining
- Manufacturing Software
- Materials Handling
- Metals/Materials
- Oxyfuel Cutting
- Plasma Cutting
- Power Tools
- Punching and Other Holemaking
- Roll Forming
- Safety
- Sawing
- Shearing
- Shop Management
- Testing and Measuring
- Tube and Pipe Fabrication
- Tube and Pipe Production
- Waterjet Cutting
Industry Directory
Webcasts
Podcasts
FAB 40
Advertise
Subscribe
Account Login
Search
The real costs behind miscommunication
- By Tim Heston
- January 22, 2013
For certain product lines at least, no longer will GE’s supply chain span the globe. Instead, manufacturing will benefit from a tight, local supply chain. Shorter product life cycles demand it, as do the short times to market required today. As The Atlantic article described it for one of GE’s water heaters:
“It used to take five weeks to get the GeoSpring water heaters from the factory to U.S. retailers--four weeks on the boat from China and one week dockside to clear customs. Today, the water heaters--and the dishwashers and refrigerators--move straight from the manufacturing buildings to Appliance Park’s warehouse out back, from which they can be delivered to Lowe’s and Home Depot. Total time from factory to warehouse: 30 minutes.”
The article also details the benefits of collaboration between designers and manufacturers. Designing not only for customer usability but also for manufacturability has helped companies like GE beat the China price. When GeoSpring water heaters were made in China, they retailed for $1,599. Today, the Louisville-made units sell for $300 less.
As the article describes, distance alone doesn’t necessarily prove that making things down the street is always better than making them across the Pacific. Sure, there are all sorts of hard costs that are easily quantifiable. But the less quantifiable problems, including communication breakdowns, may be even more costly. Boeing’s recent troubles with the Dreamliner exemplify this.
Some have said that the fact Boeing spread design duties up and down the supply chain decentralized control, leading to all sorts of production problems. But really, the fact that Boeing spread design duties down the supply chain didn’t directly cause the problems. Throughout manufacturing, suppliers assist in designs all the time. It’s what helps suppliers win business.
It was the breakdown in communication. Everybody wasn’t on the same page. Combine this with the fact that the Dreamliner took such a new approach to so many design details, and you’ve got a recipe for, well, the drama that has played out in recent years.
Boiled down, it’s not about where a manufacturer is; it’s about how well that manufacturer communicates with others, be it other departments within the same company, or other manufacturers in the supply chain. This bodes well for U.S. manufacturing because, at last, the conversation is moving away from labor costs. Cheap labor making bad components is, really, the most expensive labor of all.
GE’s Louisville campus may be proof that good collaboration between design and manufacturing may give the U.S. a leg up not only because of its location--close to consumers--but also because of efficient information exchange. Shipping parts back and forth across an ocean costs time and money, but miscommunication between designers, engineers, and manufacturers can cost so much more.
subscribe now
The Fabricator is North America's leading magazine for the metal forming and fabricating industry. The magazine delivers the news, technical articles, and case histories that enable fabricators to do their jobs more efficiently. The Fabricator has served the industry since 1970.
start your free subscriptionAbout the Author
Tim Heston
2135 Point Blvd
Elgin, IL 60123
815-381-1314
Tim Heston, The Fabricator's senior editor, has covered the metal fabrication industry since 1998, starting his career at the American Welding Society's Welding Journal. Since then he has covered the full range of metal fabrication processes, from stamping, bending, and cutting to grinding and polishing. He joined The Fabricator's staff in October 2007.
- Stay connected from anywhere
Easily access valuable industry resources now with full access to the digital edition of The Fabricator.
Easily access valuable industry resources now with full access to the digital edition of The Welder.
Easily access valuable industry resources now with full access to the digital edition of The Tube and Pipe Journal.
Easily access valuable industry resources now with full access to the digital edition of The Fabricator en Español.
- Podcasting
- Podcast:
- The Fabricator Podcast
- Published:
- 03/05/2024
- Running Time:
- 65:35
After Ludlow Manufacturing Inc. (LMI) received The Fabricator's 2024 Industry Award, Todd Ludlow, founder and president of the...
- Industry Events
NASCC: The Steel Conference
- March 20 - 22, 2024
- San Antonio,
The Fabricator's Manufacturers & Suppliers Event (MSE)
- March 26, 2024
- Schaumburg, IL
Coil Processing Workshop & Tours
- April 2 - 3, 2024
- Corpus Christi, TX
GOLF4MFG South
- April 15, 2024
- Charlotte, NC
16th Annual Safety Conference
- April 30 - May 1, 2024
- Elgin,