- FMA
- The Fabricator
- FABTECH
- Canadian Metalworking
Categories
- Additive Manufacturing
- Aluminum Welding
- Arc Welding
- Assembly and Joining
- Automation and Robotics
- Bending and Forming
- Consumables
- Cutting and Weld Prep
- Electric Vehicles
- En Español
- Finishing
- Hydroforming
- Laser Cutting
- Laser Welding
- Machining
- Manufacturing Software
- Materials Handling
- Metals/Materials
- Oxyfuel Cutting
- Plasma Cutting
- Power Tools
- Punching and Other Holemaking
- Roll Forming
- Safety
- Sawing
- Shearing
- Shop Management
- Testing and Measuring
- Tube and Pipe Fabrication
- Tube and Pipe Production
- Waterjet Cutting
Industry Directory
Webcasts
Podcasts
FAB 40
Advertise
Subscribe
Account Login
Search
Arc Welding 101: Preheating a shaft-sprocket assembly
- By Paul Cameron
- February 13, 2007
- Article
- Arc Welding
Q: We are welding 1018 cold-rolled, 2.5-inch-diameter shaft to a sprocket made from 1045 steel. We preheat the shafts to about 200 to 250 degrees. We are having some failure of the shaft, and I'm wondering what the proper procedure is for welding the assembly together. The sprockets are welded full-diameter on both sides. The shaft usually breaks at the transition from the edge of the weld. Should we be preheating to a higher temperature, heating both the shaft and the sprockets, or not preheating at all?
John A.
You're joining a low-carbon (less than 20 percent) shaft to a medium-carbon (more that 40 percent) sprocket. You're on the right track, but your preheat must include the sprocket. It also should be in the 200- to 400-degree range, depending on the process used and joint thickness.
Maintain this same range for interpass temperature. Use a low-hydrogen procedure and filler metal; hydrogen pickup through dilution will contribute to a high weld metal hardness, which will increase susceptibility to cracking and brittleness. Minimize dilution by depositing small weld beads in a multipass technique.
Finally, use a postweld heat treatment. If this isn't practical, maintain the preheat/interpass temperature for two to three hours per inch of joint thickness.
About the Author
Paul Cameron
Braun Intertec
4210 Highway 14 East
Rochester, MN 55904
About the Publication
subscribe now
The Welder, formerly known as Practical Welding Today, is a showcase of the real people who make the products we use and work with every day. This magazine has served the welding community in North America well for more than 20 years.
start your free subscription- Stay connected from anywhere
Easily access valuable industry resources now with full access to the digital edition of The Fabricator.
Easily access valuable industry resources now with full access to the digital edition of The Welder.
Easily access valuable industry resources now with full access to the digital edition of The Tube and Pipe Journal.
Easily access valuable industry resources now with full access to the digital edition of The Fabricator en Español.
- Podcasting
- Podcast:
- The Fabricator Podcast
- Published:
- 04/16/2024
- Running Time:
- 63:29
In this episode of The Fabricator Podcast, Caleb Chamberlain, co-founder and CEO of OSH Cut, discusses his company’s...
- Trending Articles
Sheffield Forgemasters makes global leap in welding technology
ESAB unveils Texas facility renovation
Engine-driven welding machines include integrated air compressors
How welders can stay safe during grinding
The impact of sine and square waves in aluminum AC welding, Part I
- Industry Events
16th Annual Safety Conference
- April 30 - May 1, 2024
- Elgin,
Pipe and Tube Conference
- May 21 - 22, 2024
- Omaha, NE
World-Class Roll Forming Workshop
- June 5 - 6, 2024
- Louisville, KY
Advanced Laser Application Workshop
- June 25 - 27, 2024
- Novi, MI