- FMA
- The Fabricator
- FABTECH
- Canadian Metalworking
Categories
- Additive Manufacturing
- Aluminum Welding
- Arc Welding
- Assembly and Joining
- Automation and Robotics
- Bending and Forming
- Consumables
- Cutting and Weld Prep
- Electric Vehicles
- En Español
- Finishing
- Hydroforming
- Laser Cutting
- Laser Welding
- Machining
- Manufacturing Software
- Materials Handling
- Metals/Materials
- Oxyfuel Cutting
- Plasma Cutting
- Power Tools
- Punching and Other Holemaking
- Roll Forming
- Safety
- Sawing
- Shearing
- Shop Management
- Testing and Measuring
- Tube and Pipe Fabrication
- Tube and Pipe Production
- Waterjet Cutting
Industry Directory
Webcasts
Podcasts
FAB 40
Advertise
Subscribe
Account Login
Search
The Tube and Pipe Journal January/February 2003
The Tube and Pipe Journal became the first magazine dedicated to serving the metal tube and pipe industry in 1990. Today, it remains the only North American publication devoted to this industry, and it has become the most trusted source of information for tube and pipe professionals.
Using precision abrasive wheel technology
- By Jordon Jablons
- Mar 13, 2003
- Tube and Pipe Fabrication
- Article
Precision abrasive wheel cutting is a small but important niche in the abrasive cutting field. It can be used to cut many types of parts, including metal rods, tubes, extruded shapes, and even wire. It is most useful in operations characterized by small parts, hard-to-cut materials, and tight tolerances.
Heating P91 boiler pipe
- By Mike Roth
- Mar 13, 2003
- Tube and Pipe Fabrication
- Article
In the power piping industry, turnaround time on a boiler pipe project typically is from 20 to 36 weeks. But J.F. Ahern Co. (JFA), Fond du Lac, Wis., a company ranked as one of the Midwest's top 10 mechanical contractors according to the May 2002 Contractor magazine, isn't typical. Neither were the results JFA achieved when it switched to induction technology for pipe preheating.
Don't lose your bearing!
- By W.B. "Bud" Graham
- Feb 27, 2003
- Tube and Pipe Production
- Article
It's Monday morning after a long holiday weekend, and the first shift is starting with a bang. The slit coil supplier is late with your delivery, the second-shift maintenance person has called in sick, the mill operator is going to be late to work, and you wish you were still at the beach with the family.
- Podcasting
- Podcast:
- The Fabricator Podcast
- Published:
- 04/16/2024
- Running Time:
- 63:29
In this episode of The Fabricator Podcast, Caleb Chamberlain, co-founder and CEO of OSH Cut, discusses his company’s...
- Trending Articles
Team Industries names director of advanced technology and manufacturing
Orbital tube welding webinar to be held April 23
Zekelman Industries to invest $120 million in Arkansas expansion
Push-feeding saw station cuts nonferrous metals
3D laser tube cutting system available in 3, 4, or 5 kW
- Industry Events
16th Annual Safety Conference
- April 30 - May 1, 2024
- Elgin,
Pipe and Tube Conference
- May 21 - 22, 2024
- Omaha, NE
World-Class Roll Forming Workshop
- June 5 - 6, 2024
- Louisville, KY
Advanced Laser Application Workshop
- June 25 - 27, 2024
- Novi, MI
- Upcoming Webcasts
Navigating Change: The Manufacturer’s Guide to Change Management with ERP Implementation
- May 16, 2024
- Sponsored
- Presented By: ECI Software Solutions, M1