- FMA
- The Fabricator
- FABTECH
- Canadian Metalworking
Categories
- Additive Manufacturing
- Aluminum Welding
- Arc Welding
- Assembly and Joining
- Automation and Robotics
- Bending and Forming
- Consumables
- Cutting and Weld Prep
- Electric Vehicles
- En Español
- Finishing
- Hydroforming
- Laser Cutting
- Laser Welding
- Machining
- Manufacturing Software
- Materials Handling
- Metals/Materials
- Oxyfuel Cutting
- Plasma Cutting
- Power Tools
- Punching and Other Holemaking
- Roll Forming
- Safety
- Sawing
- Shearing
- Shop Management
- Testing and Measuring
- Tube and Pipe Fabrication
- Tube and Pipe Production
- Waterjet Cutting
Industry Directory
Webcasts
Podcasts
FAB 40
Advertise
Subscribe
Account Login
Search
Automated tool change system helps cut changeover time on tube sizing machine
- February 24, 2014
- Product Release
- Tube and Pipe Production
AddisonMckee has developed an automated tool handling system for a customer forming tube from 2 to 6 in. dia. The tool sets used in the customer’s AddisonMckee HG150-IDOD tube sizing machine can weigh up to 300 lbs., so loading and unloading previously involved the use of an overhead crane system.
The pick-and-place system uses an overhead gantry to change the tooling sets, eliminating manual handling. Tooling changeover time from part to part for preprogrammed tubes is about 90 seconds.
Tools are stored within a rack system that holds up to 10 ID finger/OD jaw sets. The tube sizing machine’s control system links with the tool changer system and uses tooling identification to store the tools in programmed storage slots and retrieve the proper tooling set for a chosen operation.
When the operator recalls a saved sizing program, the machine retrieves and installs the associated tooling set, and the machine automatically adjusts to the preprogram parameters.
Related Companies
subscribe now
The Tube and Pipe Journal became the first magazine dedicated to serving the metal tube and pipe industry in 1990. Today, it remains the only North American publication devoted to this industry, and it has become the most trusted source of information for tube and pipe professionals.
start your free subscription- Stay connected from anywhere
Easily access valuable industry resources now with full access to the digital edition of The Fabricator.
Easily access valuable industry resources now with full access to the digital edition of The Welder.
Easily access valuable industry resources now with full access to the digital edition of The Tube and Pipe Journal.
Easily access valuable industry resources now with full access to the digital edition of The Fabricator en Español.
- Podcasting
- Podcast:
- The Fabricator Podcast
- Published:
- 04/16/2024
- Running Time:
- 63:29
In this episode of The Fabricator Podcast, Caleb Chamberlain, co-founder and CEO of OSH Cut, discusses his company’s...
- Trending Articles
Zekelman Industries to invest $120 million in Arkansas expansion
3D laser tube cutting system available in 3, 4, or 5 kW
Corrosion-inhibiting coating can be peeled off after use
Brushless copper tubing cutter adjusts to ODs up to 2-1/8 in.
HGG Profiling Equipment names area sales manager
- Industry Events
16th Annual Safety Conference
- April 30 - May 1, 2024
- Elgin,
Pipe and Tube Conference
- May 21 - 22, 2024
- Omaha, NE
World-Class Roll Forming Workshop
- June 5 - 6, 2024
- Louisville, KY
Advanced Laser Application Workshop
- June 25 - 27, 2024
- Novi, MI